MIL-C-48286A (PA)
5.2.1 Level A. - The charge assemblies shall be packed
in accordance with dwgs. 9287686 and CFR 49 parts 0-190.
5.3 Marking. - Marking of the carton shall comply with
level A, dwg. 9287686. Markings shall also specify the part
nomenclature and Class of Explosive as well as a note, HANDLE
CAREFULLY.
5.4 Shipping. - When components of more than one lot are "
shipped as a carload, each lot shall be-kept separate, and the
division between lots clearly indicated to prevent mixing of
the lots in transit.
NOTES
6.
6.1 Ordering data. - Procurement documents shall specify
the following:
a. Title, number and date of this specification.
b. Data cards. - Data cards shall be prepared for
each lot in accordance with the information specified In
..
Standard MIL-STD-1167.
c. Provisions for submission of first article samples.
6.2 Inspection Equipment Desi gns. - Inspection equipment
designs are of two types - Government Special Inspection Equip-
ment (SIE) designs and contractor designs. SIE designs are
designated by drawin numbers under the "Method of Inspection"
headings in Section 4. Design responsibility for all other
inspection equipment is assigned to the contractor. The
contractor need not furnish any design when a complete Govern-
ment SIE design is provided. Unless otherwise specified, how-
ever, the contractor may submit alternate or modified contractor
designs of SIE in accordance with 6.3.2 and 6.3.3 should he
elect to do so.
6.2.1 SIE designs. - SIE designs may consist of any of
the following:
-
a. Det ailed drawings which completely depict all infor-
mation necessary for the fabrication and use of' the Item of
inspection equipment.
b. A source control drawing or a specification control
drawing as defined in MIL-STD-100.
c. An envelope drawing, as defined In MIL-STD-100,
which establishes the criteria which a detailed design shall
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business