MIL-M-45424D (MU)
3.4 Workmanship.-All parts shall be fabricated and
finished in a thorough, workmanlike manner. They shall be
free of burrs, chips, sharp edges, cracks, crazes, porosity,
warpage, burn marks, checks, blisters, excess flash, unblended
radii, chipped edges, scratches, dirt, grease, rust, corrosion
products and other defects and foreign matter which would affect
appearance or serviceability. The cleaning method used shall
not be injurious to any part nor shall the parts be contaminated
by the cleaning agent. All required markings shall be neat,
legible and sharply defined.
3.5 First article inspection.-This specification makes
provisions for first article inspection. Requirements for the
submission of first article samples by the contractor shall be
as specified in the contract.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.-Unless otherwise
specified in the contract or purchase order, the supplier is
responsible for the performance of all inspection requirements
as specified herein. Except as otherwise specified in the
contract or order, the supplier may use his own or any other
facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any
of the inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and
services conform to prescribed requirements. Refernce shall
be made to MIL-STD-109 to define terms used herein. The
provisions of MIL-A-2550 shall apply.
4.1.1 Submission of product.-At the time each completed
lot of items deliverable under the contract is submitted to the
Government for acceptance, the contractor shall bupply the
following information accompanied by a certificate which
attests that the information provided is correct and applicable
to the product being submitted:
a. A statement that the lot complies with all of the
quality assurance provisions specified in this specification.
b. Drawing and specification number and date,
together with identification and date of changes thereto.
c. A statement that all material purchased by the
contractor meets requirements, when such material is controlled
by Government or commercial specifications referenced in any of
the contractual documents, and that certificates of conformance
are on file and available for review.
3