MIL-I-50412 (MU)
6.3.1 Inspection equipment lists (EL) . -Inspection equipment
lists indicate the availablity of inspection equipment designs
by showing in the "number" column of the list of inspection
equipment (Form SMUPA 1010) the numbers of drawings or Federal
Stock numbers of existing equipment designs, or codes as
indicated In paragraph 6.3.2, Design action required of the
contractor is described in paragraphs 6.3,3 and 6.3.4. The
contractor will be required to prepare detailed drawings In
accordance with 6.3.4 for all the equipment coded as "Contractor
Design" In the number column. These contractor designs must be
approved by the Government prior to fabrication or procuring
of the equipment. Designs shall be submitted for approval as
specified In 6.3.5.
6.3.2 Inspection equipment list codes. -The inspection
equipment as defined in 6.3.3 and 6.3.4 will be designated In
the EL by the following codes:
CD - Contractor design on controlled contractor format
and/or commercial equipment,
MU - Army design, mandatory for use.
6.3.3 Army designs. -Army designs are reflected on detailed
drawings which completely depict all the information necessary
for the fabrication of the item of inspection equipment. The
contractor need provide no design when an Army design is listed
for an item of Inspection equipment. Army designs fall into two
basic classifications ; mandatory (designated "MU") and
non-mandatory indicated by drawing or Federal Stock Number) .
When an inspection equipment list references mandatory Army
designs, the contractor shall comply with, and use these
designs accordingly. The contractor may , however , in connection
with non-mandatory designs , and with the approval of the
Government design alternate inspection equipment or use
comparable commercial equipment to facilitate his operations.
Such contractor prepared designs or commercial equipment
selections must be approved by the Government prior to
fabrication or procuring of the equipment. Designs shall be
submitted for approval as specified in 6. 3.5.
6.3.4 Contractor designs. - Contractor designs are designs
of inspection equipment. for which the Government has assigned
design responsibility to the contractor. Contractor designs
shall be supported by detailed
drawings which depict all
information necessary to completely fabricate, calibrate and
operate an item or inspection. equipment. This requires that
the necessary views, dimensions, materials, finish, notes
operating and calibration Instructions be properly depicted In
accordance with approved practices to the extent that further
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business