MIL-I-50412 (MU)
3.4 Relative Quickness. -The relative quickness of the
front support shall be not less than 300 percent, when compared
to M26E1 Propellant Lot RAD-65294 or Equivalent, and tested in
accordance with 4.3.3.3 (see 6.5).
3.5 Crush strength .-The crush strength of the front
support shall be 100 pounds minimum In the vertical direction and
40 pounds minimum in the horizontal direction when tested as
specified in 4,3,3.4,
3.6 Workmanship, -All parts and assemblies shall be
fabricated and finished in a thorough, workmanlike manner.
They shall be free of chips, cracks, dirt, grease, flux, rust,
corrosion products and other foreign matter. The cleaning method
used shall not be injurious to any part, nor shall the parts be
contaminated by the cleaning agent. All required markings shall
be neat and sharply defined.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.-Unless otherwise
specified in the contract or purchase order, the supplier is
responsible for the performance of all Inspection requirements
as specified herein. Except as otherwise specified In the
contract or order, the supplier may use his own or any other
facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any
of the Inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and services
conform to prescribed requirements. Reference shall be made
to Standard MIL-STD-109 in order to define terms used herein.
The provisions of Specification MIL-A-2550 shall apply.
4.1.1 Submission of product .-At the time the completed
lot of items deliverable under the contract Is submitted to
the Government for acceptance, the contractor shall supply
the following information accompanied by a certificate which
attests that the Information provided is correct and applicable
to the product being submitted:
a. A statement that the lot complies with all of the
quality assurance provisions specified in this specification.
b. Drawing and specification number and date, together
with an identification and date of changes thereto.
c. A statement that all material purchased by the
contractor meets requirements, when such material is controlled
by Government or commercial specifications referenced In any of
the contractual documents, and that certificates of conformance
are on file and available for review.
d, Number of items in the lot.
e. Date submitted.
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business