MIL-DTL-45417D
5. PACKAGING
5.1. Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When packaging of materiel is to be performed by
DOD or in-house contractor personnel, these personnel need to contact the responsible
packaging activity to ascertain packaging requirements. Packaging requirements are maintained
by the Inventory Control Point's packaging activities within the Military Service or Defense
Agency, or within the military service's system commands. Packaging data retrieval is available
from the managing Military Department's or Defense Agency's automated packaging files, CD-
ROM products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful but is
not mandatory.)
6.1. Intended use. The M7 bandoleer is used to house and carry the tactical M18A1
APERS Mine or practice M68 APERS Mine. The M7 has two pockets, one for the tactical or
inert mine assembly and the other for the initiation component(s). Older electrical versions of
the M18A1 APERS Mine and M68 APERS Mine assembly used the M4 blasting cap (M10 for
Practice assembly), with or without M57 firing device and M40 test set, as part of the full
assembly. Newer non-electric versions now have the Mini Det Assembly (Inert Mini Det
Assembly) that replace the electrical components.
6.2. Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of this specification, and of all reference documents cited
in Section 2 and applicable documents from Section 6.
b. Requirement for physical configuration audit.
c. Requirement for first article inspection.
d. Requirement for conformance inspection.
e. Requirement for Ammunition Data Cards (ADC's) as specified in MIL-STD-1168.
f. Requirement for ammunition lot numbering per MIL-STD-1168.
g. Ammunition marking requirements.
h. Acceptance Inspection Equipment (AIE) requirements.
i. Requirement for certificates of findings (certificates of analysis) on all remaining
materials purchased by the contractor or subcontractor when such material is
controlled by Government or commercial specifications referenced in any of the
contractual documents.
j. Certificates of conformance(s).
6.3. Amendment overview of changes. The following approved Engineering Change
Proposal (ECP) is being incorporated into this document: R13N2001, R04N2017
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business