MIL-W-48238A (PA)
4.3.3 TESTING
4.3.3.1 Protective finish (see 3.3) - Major A defect -
A sample of ten (10) wrenches shall be selected from each lot
*4.3.4 Inspection Equipment. - The inspection equipment
required to perform the inspections and tests prescribed in
this specification is identified in the `Paragraph Reference/
Inspection Method' column in the tables starting with paragraph
4.3.2.1 and the test method paragraphs (see 4.4). The contrac-
tor shall submit for approval, inspection equipment designs
in accordance with the terms of the contract. See Section 6
of MIL-A-48078, and Section 6.2 herein.
4.4 Test Methods and Procedure
4.4.1 Protective finish. - The wrenches shall be subjected
to the salt fog specified in MIL-STD-331, Method 107.1 except
that exposure test time shall be 24 hours minimum (min.).
PREPARATION FOR DELIVERY
5.
5.1 Preservation and packaging
5.1.1 Level C. - The wrenches shall be packaged in accord-
ance with MIL-STD-1169 in such a manner that no damage will
occur during shipment.
5.2 Packing
5.2.1 Level C. - The wrenches shall be packed in accord-
ance with MIL-STD-1169.
5.3 Marking and labeling. - Marking of cartons shall be in
accordance with MIL-STD-1169.
6.
NOTES
*6.1 Ordering Data. - Procurement docuemnts shall specify
the following:
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business