MIL-W-48238A (PA)
DRAWINGS
*U.S . ARMY PICATINNY ARSENAL
9209342 - Wrench, Arming, NM, Mine, M22
*(For meaning of asterisk (*) see 6.4).
(Copies of specifications, standards, and drawings required by
contractors in connection with specific procurement functions
should be obtained from the procuring activity or as directed
by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials and parts shall be in accord-
ance with applicable drawings and specifications.
3.2 Wrench. - The wrench shall comply with all require-
ments specified on drawing (Dwg.) 9209342 and with all require-
ments specified on applicable specifications.
3.3 Protective finish. - There shall be no evidence of
rust or corrosion of metals due to salt deposits when the
wrenches are subjected to salt fog per MIL-STD-331, Test 107.1.
*3.4 Workmanship. - All parts and assemblies shall be fab-
ricated and finished in a thorough workmanlike manner, and
all manufacturing, processing, and assembly operations shall
be correctly performed. They shall be clean and free of
burrs, sharp edges, unblended radii, surface defects, chips,
dirt, grease and oil (except where specifically required),
method used shall not be injurious to any part or assembly
nor shall they be contaminated by the cleaning agent. Ex-
terior surface coatings shall be continuous except for a few
light scratches not exposing base material. All required mark-
ings shall be neat and sharply defined. Required packing shall
be dry.
4.
QUALITY ASSURANCE PROVISIONS
*4.1 Responsibility for Inspection and Standard Quality
Assurance Provisions. - Unless otherwise specified herein or
in the contract, the provisions of MIL-A-48078 shall apply
and are hereby made a part of this detail specification-,
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business