4.4.3.1 Dispenser resistance test (dwg. 9296700) -
Major A Defect. - Each dispenser lot shall be tested 100
A
for
the specified requirements in accordance with 4.5.2. All
dispensers classed defective shall be removed from the lot.
4.3.3 Container Leak Test (dwg. 9298966) - Major A
Defect. - Each completed CNU-79/E container assembly shall
be tested for the specified requirement in accordance with
Any container assembly classed defective shall be
4.5.3.
removed from the lot.
4.4.4 Inspection Equipment, - The inspection equipment
required to perform the inspections and tests prescribed in
this specification is identified in the 'Paragraph Reference/
Inspection Method' column in the tables starting with para-
graph 4.4.2.1, and the test method paragraphs (see 4.5).
The contractor shall submit for approval, inspection equip-
ment designs in accordance with the terms of the contract.
See Section 6 of MIL-A-46078, and 6.3 herein.
4.5.2 Intervalometer test. - Each dispenser shall be
tested for the specified requirement using the U.S.A.F. test
set No. 24 AET-80 (Intervalometer test set), dwg. 9289146.
Any dispenser failing to comply with all of the specified
requirements shall be classed defective. Testing is non-
destructive and only accepted dispensers shall be returned
to the lot.
4.5.3 Container Leak Test. - The container shall be
pressurized to the specified 3 1/2 p.s.i. requirement and
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business