MIL-E-48630(AR)
The contractor relocate his assembly facilities.
b.
The contractor uses a new sub-contractor for material,
parts, or assembly.
d. A change occurs in devices' material, performance
assembly, or design.
The contractor ceased production for more than 90 days.
e.
4.
QUALITY ASSURANCE PROVISIONS
First article inspection
a.
Quality conformance inspection
b.
First article inspection.
4.3
4.3.1 Submission. The contractor shall submit a first article
sample, as designated by the Contracting Officer, for evaluation in
accordance with the provisions of 4.3.2 and 4.3.3. The first
article sample shall consist of the parts/assemblies listed below in
the quantities indicated:
See MIL-A-48078 and Table 1
4.3.2 Inspections to be performed.
specified herein.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business