MI L-C-48887 (PA)
Sampling Procedures and Tables for
M I L - S T D - 105 -
Inspection by Attributes (ABC- ST D-105)
MIL-STD-1168 - Lot Numbering of Ammunition
MIL-STD-1235 - Single and Multilevel Continuous
Sampling Procedures and Tables for
Inspection by Attributes
DRAWINGS
PICATINNY ARSENAL
76-4-59 - BOX, packing Metal-Wood, M18 for smokeless
Powder, Assembly
8796343 - Propelling Charge Assembly
7548645 - Box, Fiberboard, Packing, Reusable,
Collapsible, For High Explosives
8858848 - Marking Diagram and Sealing of Metal lined
Wooden Packing boxes for shipment of Pro-
pellants
9241693 - packing and Marking of Fiberboard cartons
for shipment of propellant increments
[Copies of specifications, standards and drawings required by
contractors in connection with specific procurement functions
should be obtained from the procuring activity or as directed
by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials and parts shall be in accordance
with applicable drawings and specifications.
3.2 Propelling Charge Assembly. - The propelling charge
assemblies shall comply with all the requirements specified on
drawing 8796345 and with all requirements specified in applicable
sP edifications.
3.3 Moisture Content of Black Powder. - The moisture content
of the black powder at the time of loading shall not exceed the
percentage specified in Specification MIL-P-223.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business