MIL-C-48743A (PA)
(Copies of specifications; standards, drawings, and publications
required by contractors in connection with specific procurement
functions should be obtained from the procuring activity or as
directed by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials shall be in accordance with the
applicable drawings and specifications.
3.2 Assembly. - The Charge, Mine ejection assembly training
shall comply with all requirements specified on drawing 9287629
as applicable, all associated drawings and with all requirements
specified in applicable specifications.
3.3 Workmanship. - All parts and assemblies shall be fab-
ricated and finished in a thorough workmanlike manner. They
shall be free of burrs, chips, sharp edges, cracks, unblended
radii, surface defects, dirt, grease, rust, corrosion products,
and other foreign matter. The cleaning method used shall not
be injurious to any parts, nor shall the parts be contaminated
by the cleaning agents. All marking and stamping shall be neat
and sharply defined.
3.4 Submission of results of contractor-conducted examinations
and tests. - The contractor shall forward copies of the result of
any of his examinations or tests to the designated address as speci-
fied in 6.4.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection and standard quality
assurance provisions. - Unless otherwise specified herein or
in the contract, the provisions of MIL-A-48078 shall apply and are
hereby made a part of this detail specification.
4.2 Classification of' inspections. - The following type of
inspection shall be conducted on
is item.:
a. Quality Conformance lnspection
4.3 First article inspection. - None required
4.4 Quality conformance inspection
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business