MIL-W-48763 (PA)
DRAWINGS
U.S. ARMY PICATINNY ARSENAL
9214053 - Wrench, Fuzing, Anti-Personnel Mine, M25
(Copies of specifications, standards, and drawings required by
contractors `In connection with specific procurement functions
should be obtained from the procuring activity or as directed
by the Contracting Officer).
REQUIREMENTS
3.
3.1 Material. - Materials and parts shall be in accord-
ance with appli cable drawings and specifications.
3.2 Wrench. - The wrench shall comply with all requirem-
ents specified on drawing (Dwg.) 9214053 and with all require-
ments specified on applicable specifications.
3.3 Protective finish. - There shall be no evidence of
rust or corrosion of metals due to salt deposits when the
wrenches are subjected to salt fog per MIL-STD-331, Test 107.1.
3.4; Workmanship. - All parts shall be fabricated and
finished In a thorough workmanlike manner, and all manufacturing,
processing, and assembly operations shall be correctly performed.
They shall be clean and free of burrs, sharp edges, unblended
radii , surface defects, chips, dirt, grease and oil (except
where specifically required). The cleaning method used shall
not be Injurious to any part or assembly nor shall they be
contaminated by the cleaning agent. Exterior surface coatings
shall be continuous except for a few light scratches not
exposing base material. All required markings shall be neat
and sharply defined. Required packing shall be dry.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection and Standard Quality
Assurance Provisions. - Unless otherwise specified herein or
in he contract, t he provisions of MIL-A-48078 shall apply
-
and are hereby made a part of this detail specification.
4.2 Classification of inspection. - The following type
of inspection shall be conducted on this item.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business