MIL-P-70668(AR)
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first
article sample as designated by the contracting officer for
evaluation in accordance with provisions of 4.3.2. The first
article sample quantities as indicated:
Part Participation
Drawing
Quantity
MIL-STD-652
Propellant, Ml, Form C, Type I
10 gram
MIL-P-223
Propellant, Black Powder
10 gram
25
Cartridge Case Assembly
9366635
Pressure Cartridge Assembly
125
9366511
15
Disc
9366605
15
Foam
9366604
Paper, Filter
15
9366607
9366606
15
Wadding
See MIL-A-48078 and Table
4.3.2 Inspection to be performed.
I specified herein.
See MIL-A-48078.
4.3.3 Rejection.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business