MIL-N-63400(AR)
4.2 Classification of inspections. The following types of
inspection shall be conducted on this item:
a.
First article inspection.
b.
Quality conformance inspection.
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with provisions of 4.3.2. The first article sample shall
consist of sixty (60) C-R networks.
4.3.2 Inspections to be performed. See Table II specified
herein. It is the intent of this document to have the capacitor and
resistor element tests run simultaneously or successively, as
applicable , to improve efficiency in running the tests.
Rejection. If any item
fails to comply with any of the
4.3.3
requirements, the first
article sample shall be
applicable
The Government reserves
the right to terminate its
rejected.
upon any failure of the
item in the sample to comply with
inspection
stated requirements.
any of the
4.3.4 Requalification. The device shall be subjected to
another First Article as stipulated in the contract if:
a. The contractor's manufacturing techniques or process
controls which affect the form, fit, function or internal geometry
of the device are revised by either the contractor or one of his
sub-contractors supplying parts or assemblies.
b.
The contractor relocated his assembly facilities.
c. The contractor uses a new sub-contractor for material,
parts, or assembly.
d.
A change occurs in devices' material, performance or
assembly.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business