MIL-C-64030(AR)
a. Manufacturing techniques or process controls which
affect the form, fit, or function of the assembly are revised by
either the contractor or one of his subcontractors supplying parts
or assemblies or materials.
b. The contractor relocates his production facilities or
portions thereof.
c. The contractor desires to use a new subcontractor
(unqualified) for materials, parts or assemblies.
d. A change occurs in the design, material, performance
or assembly of the control indicator.
e. A lapse in production for a period of 90 days or as
stipulated in the contract.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business